Maersk is advancing on the design of a to be implemented from February 2025. With 58 services and more than 6,000 port-to-port combination across the world, the new network will offer customers industry-leading reliability, geographic reach, and speed. Key to achieving this is a careful combination of 290 mainliner and shuttle vessels with a combined TEU of 3.4 million.

What is a mainliner service?

Mainliner services are the backbone of the new network. They:

  • service key markets with consistently high volumes
  • are designed around loops operated entirely by Maersk, or
  • have an average of eight port calls

The 26 mainliner services that make up the new network have fewer port calls than previously. This reduces the risk of disruption and improves transit times for cargo.

Shuttle services and strengths explained

The network will include a mainliner network offering robust and extensive coverage. This mainliner network will be supplemented by 32 shuttle services.

The shuttle services have the following advantages:

  • fully operated by Maersk
  • offering similar capacity to the mainliner vessels
  • each service has just two or three port calls, on average

Shuttles ensure we continue to offer the same capacity as today, and the same geographic coverage. At the same time, they contribute significantly to achieving reliability, competitive transit times, and flexibility, as explained below. They also offer a high level of consistency and certainty to customers.

In addition to the shuttles, regular feeder coverage will be provided in close collaboration with strategic suppliers. This is similar to what is currently place with the 2M Alliance.

Raising service quality to new heights

The network is being carefully considered so that the different vessel types work alongside each other and deliver the greatest possible service quality to customers. Shuttles have the following benefits:

  • Reliability – with mainliner loops and shuttle vessels having smaller numbers of port calls, there are fewer opportunities for disruption
  • Competitive transit times – the combination of mainliners and shuttles offers access to all markets, while having fewer port calls means cargo can get to its destination efficiently and reliably.
  • Flexibility – shuttle vessels can more easily and quickly respond to changes in demand

Key to the success of the network is making sure the different vessels are connected by port terminals with the exceptional productivity and reliability. These terminals, where either APM Terminals or Hapag-Lloyd has a level of operation control, serve as ‘hubs’.

Within the hubs, both the mainliners and the shuttles will be given the priority needed to transfer their cargo quickly and seamlessly. At the same time, investments in these hubs will ensure systems and processes are as efficient and reliable as possible and equipped to meet the needs of the new network.

Our new East-West Network

Preparations are underway to ensure the network will be ready to implement from 1 February 2025. Between now and then, we will continue to share insights into the network’s design and how it will achieve its goals. That includes aiming to reach +90% schedule reliability once the network is fully phased in, as well as offering customers competitive transit time and greater access to Maersk’s of transportation products and logistical services.

To stay up to the date with the latest information, visit our dedicated page on the .

无论您需要什么,东升国际 都可以随时为您提供帮助

解决方案

解决方案

东升国际 满足从供应链一端到另一端的客户需求。
联系东升国际

联系东升国际

东升国际 的专家团队随时为您服务。
查询价格

准备好运送货物?

查询航运及内陆运输费率。
关注最新动态
注册订阅东升国际东升国际 与洞察
收取直接发送至您收件箱的有关供应链趋势的宝贵信息,在业内保持一路领先

提交此表,即表示我同意通过电子邮件接收 A. P. 穆勒-东升国际集团及其关联公司接收物流相关东升国际 和营销信息更新。我了解我可以随时通过点击退订链接,取消接收此类东升国际推送信息。如需查看东升国际 会如何处理您的个人信息,请查阅。

感谢您注册
您现在已经注册接收东升国际 通讯。您很快将收到一封电子邮件,其中将说明如何对该东升国际 通讯进行偏好设置。
已订阅
您可以随时取消订阅。