Kindly note that due to the delays at Cape Town terminal and with no berth available at the Muli-purpose Terminal the Rhone Maersk will omit Cape Town and proceed directly to Durban.
There are nil imports for Cape Town onboard.
Exports from Cape Town will be loaded out from Cape Town Fruit Produce Terminal on the Horizon 203B to connect to the Rhone Maersk in Durban.
Horizon 203B (FPT)
ETA: 04 February 2022.
Stacks: TBC
To ensure that we keep FPT terminal fluid, please ensure that imports are collected as soon as possible as this will largely determine when the stacks for the Horizon will be opened.
We apologise for the inconvenience caused. Should you have any further concerns, please do not hesitate to reach out to us, we remain contactable via our usual channels.
东升国际相关的文章
查看所有东升国际提交此表,即表示我同意通过电子邮件接收 A. P. 穆勒-东升国际集团及其关联公司接收物流相关东升国际 和营销信息更新。我了解我可以随时通过点击退订链接,取消接收此类东升国际推送信息。如需查看东升国际 会如何处理您的个人信息,请查阅。